![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
Entry tags:
Bath house Upgrades
It had been some time since the idea had been raised, the upgrade to the bath house based on an unintended but rather beneficial side effect to the initial construction that had led to the tiles above the sauna to heat up to a rather pleasant level especially so for those reptilian crew members aboard. The intent of the upgrade to make use of the unintended side affect along with some additional heating to provide second level to the bath house containing a series of larger heating pads of a variety of textures for those who wished to use them.
Thus here she was, materials gathered and ready to be used in the upgrades, the bath house closed off for the short period of the construction. The plans for the upgrade projected in a holographic manner from a crystal device not unlike the one that hung around her neck, the plans available for any to observe. With everything in place and ready to begin, all she had to do was wait for those who wished to assist her to arrive.
(OOC: Channel post related to this here)
Thus here she was, materials gathered and ready to be used in the upgrades, the bath house closed off for the short period of the construction. The plans for the upgrade projected in a holographic manner from a crystal device not unlike the one that hung around her neck, the plans available for any to observe. With everything in place and ready to begin, all she had to do was wait for those who wished to assist her to arrive.
(OOC: Channel post related to this here)